Please note, this unique platform is active but very much in a live development phase. The data fields are far from up to date - we are targeting end Q3 2026 to have all records current (we go back to 2010, it's a big job :-) There will be occasional bugs along the way - should you notice any issues, your feedback is welcomed via iitime.org/contact-us.

Namara Village & Yasawa South Secondary Schools (3065-P7859)

About

Docs & Links

Specifications

Works & Maintenance

CO2 & $s

Contacts

Charge data

Term Reports

Solar Settings
Its Time INSTALLED
2025 Yasawas Group 2 Namara
School Role & Facilities
Last Updated:
Students:
Teachers:
Classrooms:
Kindergarten:
Offices:
Storerooms:
Library/computer area:
Teachers homes in the school grounds:
Boarders (live-in students):
Hostels (Boarding houses):
Dining rooms:
Ablutions Blocks:
Project Funding

Donor - anonymous



Carbon Dioxide and Financial Savings
Document

Namara Village & Yasawa South Secondary Schools

Annual school fuel saving (litres) (1)

Annual fuel saving 0 teachers' homes getting solar (litres) (2)

Annual cartage saving (litres) (3)

Total annual fuel saving (litres) (4)

Fuel saving over 30 years (litres)

Annual CO2 saving (kgs)

CO2 saving over 30 years (kgs)

Annual AUD saving (8)

Annual USD saving

Annual FJD saving

30 yrs AUD saving

30 yrs USD saving

30 yrs FJD saving

Total of All It's Time Solar Schools

Total annual school fuel saving (litres)

22,580

Total annual fuel saving 99 teachers' homes getting solar (litres)

4,550

Total annual cartage saving (litres)

3,387

Total annual fuel saving (litres) (4)

30,569

Total fuel saving over 30 years (litres)

917,070

Total annual CO2 saving (kgs)

77,943

Total CO2 saving over 30 years (kgs)

2,338,523

Total annual AUD saving (8)

$ 111,057

Total annual USD saving

$ 60,330

Total annual FJD saving

$ 129,282

Total 30 yrs AUD saving

$ 2,585,640

Total 30 yrs USD saving

$ 1,760,940

Total 30 yrs FJD saving

$ 3,878,460

Assumptions

Fuel cost in the islands in AUD/litre (5)

3.00

Fuel cartage consideration % (3)

0.15

Annual fuel consumption per teacher's home wired (litres) (2)

50.00

Annual generator maintenance consideration AUD (6)

1500.00

CO2 produced per litre of fuel burned (kgs) (7)

2.55

AUD to USD conversion rate used

0.70

AUD to FJD conversion rate used

1.50

Notes

(1) This is the annual fuel consumption based on reporting from the school at the time of school survey and affirmed at the time of installation. It refers to direct fuel use by the school, not including teachers' homes.

(2) The fuel consumption of teachers' homes varies considerable between homes and over time. Their sources of energy varies from their own small generators to shared generators, still some use kerosene for lighting and some small solar (often failing) for lights and charging. Recently on Beqa Island two of the 7 households at one school were each using 10 litres of fuel per week and some were using very little. So, we have chosen the conservative underestimate of each household saving of 2 litres per week (approx. 5 kgs of CO2).

(3) Most schools have a cost to get fuel to the school - usually small boats and car/truck on the mainland. The costs vary from small amounts to some schools where the cartage cost is almost the same as the cost of the fuel itself. The cartage consideration (dollar and carbon cost) is a percentage of the total fuel consumption, because it varies widely from school to school we have chosen quite a conservative estimate.

(4) Includes cartage and teachers' home consumption estimate that therefore contribute to the total CO2 saving. But we do not include the teachers home in the financial saving - rather we just refer to the savings from the school generator.

(5) This is the current published diesel price in Fiji presented in AUD. Often the islands pay a higher price, but that is not factored in, so generally the price will be a small under estimation.

(6) Generators often require repairs and eventually replacement. That cost varies significantly from school to school, so a conservative value is applied to represent this component of cost/saving for all schools. It is not possible to calculate that accurately for every school, hence the estimate across all.

(7) Burning diesel produces CO2 at a rate of 2.68 kgs/litre, whereas petrol produces it at a rate of 2.31 kgs/litre. We have chosen 2.55 as the approximate for our calculations because there is more diesel used than petrol in the school generators.

(8) The fuel savings in the teachers' homes are not included in the calculation of financial savings for the school. Although teachers are asked to make a small contribution each term (FJD70) for their now 24-hour power and this goes to the school to buy more education resources.

Specifications
Document
01 January 0001


Inverters

Inverter type

Panels

Panel type

Number of panels

Array (watts)

Mountings

Mountings

Brand

Batteries

Battery type

Number of batteries

Kilowatt hours

Batteries mounted


Partners

Solar contractor

General electric works constractor

Contacts
Document
Status First Name Last Name Position Questionnaire Role Phone Email FB Note Edited
Active Josua Malinavitilevu Manager Read Only 9739470 Sep 25
Active Ulamila Uqe Lagivalu Head of School Read Only 8444303 67598milalagivalu@gmail.com Sep 25
Active Senimelia Munadranaqo Nalesu Teacher Read Only 9451049 snalesu@gmail.com Sep 25
Active Kelera Tiqe Other Committee Read Only 2902084 Sep 25
Active Serupepeli Nagaga Other Read Only 9367024 Sep 25

Enter any potentially relevant or useful contacts aside from the school. For example, carpenter, home stays, transport, resort managers, marine biologists etc. Or details such as a Ministry or other notable person who attended the school. Whoever may have relevance or use in the future.

Charge data
Don't have login?
Document

This data is currently only available to the school and admin.

  Event

Works & Maintenance
Document
Office Manager: Upload school survey form.
Check again
Office Manager: Upload labelled line drawing.
Check again
Office Manager: Upload Completed Site Survey Template
Check again
Site Manager: Check Pre items on survey template before leaving
To do
Site Manager: Meet Project Manager discuss and get maps.
To do
Project Manager: Get maps drawn Ras
To do
Site Manager: Confirm visit schedule with Head of School
To do
Site Manager: Travel arranged. Add to comment below.
To do
Project Manager: Check survey template
To do
Project Manager: Add key and distances to line map
To do
Site Manager: Send hand drawn map to Project Manager
To do
Site Manager: Type hand written survey into online version.
To do
Project Manager: Edit map from hand drawn
To do
Site Manager: Complete hand drawn map.
To do
Site Manager: Check distances on the line map.
To do
Site Manager: Label images and videos and upload
To do
Project Manager: Create Flickr Album
To do
General: QC Checking Instructions
To do
Project Manager: Image and Narrative to feed
To do
Project Manager: All items ready for RFQ
To do
Site Manager: Send link to online survey template completed
To do
Project Manager: Review survey template.
To do
Office Manager: Set Status to Its Time SURVEYED
To do
Office Manager: Set Issues to Waiting Info
ITF clear
Office Manager: Set Status to Its Time FOR SURVEY
ITF clear
Office Manager: Add Cluster Name
ITF clear
Office Manager: Upload all docs to Google drive.
ITF clear
Office Manager: Upload satellite map.
ITF clear
Office Manager: Add Flickr Images link to docs.
ITF clear
Office Manager: Add school survey info to About
ITF clear
Office Manager: Add Contact Details
ITF clear
No staff records found.
No staff records found.
Show Log
Document
School BLD: Shorting issue May 2026
Resolve
School BLD: B2 Classrooms/Library etc.
Resolve
Inspection-Follow Up: 1.11 Conduit Entries into Subboards and Enclosures
Resolve
General - Prep: Daily Update and Image
To do
Quarters: Q4 Overall Video
To do
Quarters: Q5 Overall Video
To do
Inspection-Follow Up: Inspection report
To do
Inspection-Follow Up: Add 2 glass bunker lights
To do
Inspection-Follow Up: 1.5 Unsealed Conduit Entries into Buildings
To do
Inspection-Follow Up: 1.6 External Mechanical Protection Pipes Not Secur
To do
Inspection-Follow Up: 1.9 Conduits Not Glued or Secured into Connectors
To do
General - Prep: QC Training Video
Done
Done
General - Prep: SEAH Policy
Done
General - Prep: School/Community Support
Done
General - Prep: Changes to school contacts
Done
General - Prep: Genuine Images Only
Done
General - Site: Verification and Testing
Done
General - Site: Future Works
Done
Reticulation: Pillar box installation
Done
Reticulation: Underground cabling
Done
School BLD: Designated computer areas
Done
School BLD: Hostel and dining room
Done
School BLD: Ablutions block
Done
School BLD: Glass bunker lights
Done
School BLD: Office and Staff Rooms
Done
School BLD: Storerooms
Done
School BLD: B1 Subboard
Done
School BLD: B1 Reticulation to the BLD
Done
School BLD: B1 Classrooms/Library etc.
Done
School BLD: B2 Subboard
Done
School BLD: B2 Reticulation to the BLD
Done
School BLD: B3 Subboard
Done
School BLD: B3 Reticulation to the BLD
Done
School BLD: B3 Kindy Office.
Done
Quarters: Q1 Reticulation to the quarters
Done
Quarters: Q1 Subboard
Done
Quarters: Q1 GPOs and Lighting
Done
Quarters: Q1 Overall Video
Done
Quarters: Q2 Reticulation to the quarters
Done
Quarters: Q2 Subboard
Done
Quarters: Q2 GPOs and Lighting
Done
Quarters: Q2 Overall Video
Done
Quarters: Q3 Reticulation to the quarters
Done
Quarters: Q3 Subboard
Done
Quarters: Q3 GPOs and Lighting
Done
Quarters: Q3 Overall Video
Done
Quarters: Q4 Reticulation to the quarters
Done
Quarters: Q4 Subboard
Done
Quarters: Q4 GPOs and Lighting
Done
Quarters: Q5 Reticulation to the quarters
Done
Quarters: Q5 Subboard
Done
Quarters: Q5 GPOs and Lighting
Done
Waste Removal: Old underground cabling
Done
Waste Removal: Existing small solar systems
Done
Wrap up: Accommodation and food
Done
Inspection-Follow Up: 1.2 Building 1 / Ablutions Block see note
Done
Inspection-Follow Up: 1.3 Building 1 to Ablutions Block – see note
Done
Inspection-Follow Up: 1.4 Office Subboard Enclosure Cover
Done
Inspection-Follow Up: 1.7 Loose Pillar Boxes
Done
Inspection-Follow Up: 1.8 Pillar-Box Conduit Sealing
Done
Inspection-Follow Up: 1.10 Secondary School Building – see note
Done
General - Prep: Starlink Mini and Power Supply
Done
School BLD: Roof repairs
N/A
Quarters: Q1 Roof repairs
N/A
Quarters: Q2 Roof repairs
N/A
Quarters: Q3 Roof repairs
N/A
Quarters: Q4 Roof repairs
N/A
Quarters: Q5 Roof repairs
N/A
General - Prep: Daily Update (when there is activity)
Hold
General - Prep: Relevant Standard
Hold
VESS
Site QC Vasiti Talakubu vesspower@gmail.com +679 906 9151 Edit Delete
Site QC Catherine Ting catherine@pacificsunsolar.com +679 9006266 Edit Delete
Site QC Isimeli Serea isimeli@pacificsunsolar.com +679 8307755 Edit Delete
Manager Isikeli Waqa isi@pacificsunsolar.com 679 9125950 / 679 777 6529; Edit Delete
Its Time Foundation
Inspector Clayton Eigenmann clayton.eigenmann@itstime.org.au 900 1757 Edit Delete
Show Log
Document
Cable Ties
Resolve
Earthing
Resolve
Physical Protections
Resolve
Documentation
Resolve
2.6 Sunny Boy Inverter No. 2 Not Operating
Resolve
Set up monitoring after system fully functional
Resolve
3.2 L-Foot Spacing
Resolve
3.3 Solar-Module Clamping Zones
Resolve
3.8 Unsealed Rooftop Conduit Entries
Resolve
Contact SMA Support
To do
AC protection
To do
Inverter isolator
To do
Was the issue resolved to gain full power
To do
Mainboard
To do
Cable lengths must match in multi stacks
To do
Verification and Testing
To do
Starlink Mini and Power Supply
Done
Daily Update and Image
Done
Genuine Images Only
Done
Changes to school contacts
Done
FCCC
Done
Documentation
Done
Relevant Standard
Done
Risk Assessments and Safety Measures
Done
Inverter and Battery Name Plates
Done
Risk Assessments and Safety Measures
Done
Summary and Site Awareness
Done
Roof repairs
Done
Array mounting
Done
Cable ratings
Done
String Configuation
Done
Enclosures
Done
Junction box
Done
Standards and requirements
Done
String protection
Done
Refer Inverter - Battery and Inverter - PV
Done
AC wiring
Done
Installation
Done
AC protection
Done
AC wiring
Done
Equipment Standards
Done
SMA Tech Support Email
Done
Cable selection
Done
Earthing
Done
EnergyTrak Gateway
Done
General
Done
Non-combustible barrier
Done
AS/NZS 3000
Done
Required Labelling and Signage
Done
Images for sponsors
Done
2.1 Lynx Power-In Busbar Arrangement
Done
Lynx in an enclosure
Done
2.2 Parallel Battery Cables from Lynx ...
Done
2.5 Sunny Island Mounting Frame
Done
2.3 Damaged Battery-Isolator Enclosure
Done
2.4 Unsupported Battery Cables
Done
2.5 Sunny Island Mounting Frame
Done
3.4 Array Mounting Suitability
Done
3.5 Broken Solar Panels
Done
3.6 Grounding-Lug Installation
Done
3.7 Rooftop Cable Management
Done
3.9 Earthing-Conductor Conduits Without Mechanical
Done
Post depth, spacing and overhang
N/A
Signage
N/A
Promotional signage
N/A
Feedback on soalr QC
Hold
Additional requirements listed on the Exhibit
Hold
All parts
Hold
Documentation
Hold
VESS
Site QC Vasiti Talakubu vesspower@gmail.com +679 906 9151 Edit Delete
Site QC Catherine Ting catherine@pacificsunsolar.com +679 9006266 Edit Delete
Manager Isikeli Waqa isi@pacificsunsolar.com 679 9125950 / 679 777 6529; Edit Delete
Site QC Isimeli Serea isimeli@pacificsunsolar.com +679 8307755 Edit Delete
Its Time Foundation
Inspector Clayton Eigenmann clayton.eigenmann@itstime.org.au 900 1757 Edit Delete
Show Log
Images and videos
Term Report & Payments
Questionnaire Notes

Upload Doc 1

Upload Doc 2
Term Questionnaire
Status: Created
Invoice Details
⏳ 18 Days Overdue Outstanding