Please note, this unique platform is active but very much in a live development phase. The data fields are far from up to date - we are targeting end Q3 2026 to have all records current (we go back to 2010, it's a big job :-) There will be occasional bugs along the way - should you notice any issues, your feedback is welcomed via iitime.org/contact-us.

Rabi High School (9256-P2702)

About

Docs & Links

Specifications

Works & Maintenance

CO2 & $s

Contacts

Charge data

Term Reports

Solar Settings
Its Time INSTALLED
2026 Rabi High Single

About

Rabi High has 207 students in 2018. 40 are from nearby islands and board in the two dormitories. 21 teachers are providing classes from years 9 to 13. 12 teachers’ quarters are in the school precinct. The school has two diesel generators. One still awaiting repair and this one: check out this clip of the old thing starting up . Repair costs since 2015 exceeded $10,000. Fuel and transport of the fuel is costing the school approximately $11,000 per year for 6 hours day power and 3 hours in the night for the teachers. Currently the new solar is fulfilling all those needs with 24-hour uninterrupted power. Those fuel savings, repair costs and teachers happy to pay $90 per term for their now 24-hour power translates into many laptops and other electronic resources for the school.

This 6240W system includes: 24 x YingLi 275 solar panels, 1 x SB5000 inverter, 1 x SI8.0 inverter, 8 x Simpliphi PHI3.4 batteries, 1 x new Clenergy ground mounting system. Most tube lighting removed and replaced with LED tubes in the teachers quarters and some class rooms. The main class rooms used for night study had recently globe holders installed to replace the tubes (a recommendation we had put to the Ministry in 2016). We did not have LED globes with us, so the school is buying the globes from the fuel savings.

The project was funded by the Fiji Water Foundation. The project was installed Feb. 2018.

School Role & Facilities
Last Updated:
Students:
Teachers:
Classrooms:
Kindergarten:
Offices:
Storerooms:
Library/computer area:
Teachers homes in the school grounds:
Boarders (live-in students):
Hostels (Boarding houses):
Dining rooms:
Ablutions Blocks:

Carbon Dioxide and Financial Savings
Document

Rabi High School

Annual school fuel saving (litres) (1)

Annual fuel saving 0 teachers' homes getting solar (litres) (2)

Annual cartage saving (litres) (3)

Total annual fuel saving (litres) (4)

Fuel saving over 30 years (litres)

Annual CO2 saving (kgs)

CO2 saving over 30 years (kgs)

Annual AUD saving (8)

Annual USD saving

Annual FJD saving

30 yrs AUD saving

30 yrs USD saving

30 yrs FJD saving

Total of All It's Time Solar Schools

Total annual school fuel saving (litres)

21,580

Total annual fuel saving 91 teachers' homes getting solar (litres)

4,150

Total annual cartage saving (litres)

3,289

Total annual fuel saving (litres) (4)

29,019

Total fuel saving over 30 years (litres)

870,570

Total annual CO2 saving (kgs)

73,991

Total CO2 saving over 30 years (kgs)

2,219,949

Total annual AUD saving (8)

$ 81,238

Total annual USD saving

$ 55,233

Total annual FJD saving

$ 121,857

Total 30 yrs AUD saving

$ 2,437,140

Total 30 yrs USD saving

$ 1,656,990

Total 30 yrs FJD saving

$ 3,655,710

Assumptions

Fuel cost in the islands in AUD/litre (5)

2.00

Fuel cartage consideration % (3)

0.15

Annual fuel consumption per teacher's home wired (litres) (2)

50.00

Annual generator maintenance consideration AUD (6)

1500.00

CO2 produced per litre of fuel burned (kgs) (7)

2.55

AUD to USD conversion rate used

0.68

AUD to FJD conversion rate used

1.50

Notes

(1) This is the annual fuel consumption based on reporting from the school at the time of school survey and affirmed at the time of installation. It refers to direct fuel use by the school, not including teachers' homes.

(2) The fuel consumption of teachers' homes varies considerable between homes and over time. Their sources of energy varies from their own small generators to shared generators, still some use kerosene for lighting and some small solar (often failing) for lights and charging. Recently on Beqa Island two of the 7 households at one school were each using 10 litres of fuel per week and some were using very little. So, we have chosen the conservative underestimate of each household saving of 2 litres per week (approx. 5 kgs of CO2).

(3) Most schools have a cost to get fuel to the school - usually small boats and car/truck on the mainland. The costs vary from small amounts to some schools where the cartage cost is almost the same as the cost of the fuel itself. The cartage consideration (dollar and carbon cost) is a percentage of the total fuel consumption, because it varies widely from school to school we have chosen quite a conservative estimate.

(4) Includes cartage and teachers' home consumption estimate that therefore contribute to the total CO2 saving. But we do not include the teachers home in the financial saving - rather we just refer to the savings from the school generator.

(5) This is the current published diesel price in Fiji presented in AUD. Often the islands pay a higher price, but that is not factored in, so generally the price will be a small under estimation.

(6) Generators often require repairs and eventually replacement. That cost varies significantly from school to school, so a conservative value is applied to represent this component of cost/saving for all schools. It is not possible to calculate that accurately for every school, hence the estimate across all.

(7) Burning diesel produces CO2 at a rate of 2.68 kgs/litre, whereas petrol produces it at a rate of 2.31 kgs/litre. We have chosen 2.55 as the approximate for our calculations because there is more diesel used than petrol in the school generators.

(8) The fuel savings in the teachers' homes are not included in the calculation of financial savings for the school. Although teachers are asked to make a small contribution each term (FJD70) for their now 24-hour power and this goes to the school to buy more education resources.

Specifications
Document
28 July 2008


Inverters

Inverter type

Panels

Panel type

Number of panels

Array (watts)

Mountings

Mountings

Brand

Batteries

Battery type

Number of batteries

Kilowatt hours

Batteries mounted


Partners

Solar contractor

General electric works constractor

Contacts
Document
Status First Name Last Name Position Phone Email FB Note Edited
Active Tawaea Kaake (Mrs) Acting HOS 9545162 kaaketawaea@gmail.com May 26
Charge data
Don't have login?
Document

This data is currently only available to the school and admin.

  Event

Works & Maintenance
Document
No staff records found.
No staff records found.
Show Log
Document
General - Prep: Feedback on solar QC
Done
General - Prep: FCCC
Done
General - Prep: Documentation
Done
General - Prep: Daily Update and Image
Done
General - Prep: Pop Up Blocker
Done
General - Prep: SEAH Policy
Done
General - Prep: Starlink Mini and Power Supply
Done
Done
General - Prep: QC Training Video
Done
General - Prep: Where your work fits
Done
General - Prep: Genuine Images Only
Done
General - Prep: Changes to school contacts
Done
General - Prep: Additional requirements listed on the Exhibit
Done
Done
Equip. Specs: Noark Install Video
Done
Equip. Specs: Noark Manuals
Done
Done
Equip. Specs: Noark/Deye Support line
Done
Done
Done
Done
General - Site: Inverter and Battery Name Plates
Done
General - Site: Risk Assessments and Safety Measures
Done
General - Site: Risk Assessments and Safety Measures
Done
General - Site: Summary and Site Awareness
Done
General - Site: Roof repairs
Done
General - Site: Inform Inspector expected date you will leave site
Done
General - Site: Specific waste and return instructions
Done
Reticulation: All parts
Done
Mounts - Roof: Array mounting
Done
Array DC wiring: String configuration
Done
Array DC wiring: Cable ratings
Done
Array DC wiring: Cable Ties
Done
Array DC wiring: Earthing
Done
Array DC wiring: String Configuation
Done
Array DC wiring: Enclosures
Done
Array DC wiring: Junction box
Done
Array DC wiring: Physical Protections
Done
Array DC wiring: String protection
Done
Done
Inverter Hybrid: Refer Inverter - Battery and Inverter - PV
Done
Inverter - PV: AC protection
Done
Inverter Hybrid: Dongle Info
Done
Inverter - PV: AC wiring
Done
Inverter - PV: Installation
Done
Inverter - PV and Hybrid: Inverter isolator
Done
Done
Inverter Hybrid: Noark/Deye Support and Tips
Done
Inverter - Battery and Hybrid: AC protection
Done
Inverter - Battery and Hybrid: AC wiring
Done
Inverter - Battery and Hybrid: Equipment Standards
Done
Inverter - Battery and Hybrid: SMA Tech Support Email
Done
Mainboard: Mainboard
Done
Battery System: Cable selection
Done
Battery System: Cable length multi stacks
Done
Battery System: Earthing
Done
Battery System: EnergyTrak Gateway
Done
Battery System: General
Done
Battery System: Signage
Done
Commissioning: AS/NZS 3000
Done
Commissioning: Verification and Testing
Done
Waste Removal: Waste removal and audit
Done
Wrap: Lights are on video
Done
Wrap: Required Labelling and Signage
Done
Wrap: Images for sponsors
Done
Wrap: Future Works
Done
Wrap: General close out comments
Done
Wrap: Logistics
Done
Wrap: School/Community Support STD
Done
Inverter - Battery and Hybrid: Battery Protection SMA
N/A
Wrap: Promotional signage
N/A
Mounts - Ground: Post depth, spacing and overhang
N/A Done
Battery System: Non-combustible barrier
N/A Done
Waste Removal: Small Solar Systems
N/A Done
Array DC wiring: Standards and requirements
Hold
Battery System: Documentation
Hold
Commissioning: Documentation
Hold
Core Energy Solutions
Site QC Joeli Ragata joelircama88@gmail.com 1234567 Edit Delete
Its Time Foundation
Inspector Clayton Eigenmann clayton.eigenmann@itstime.org.au 900 1757 Edit Delete
Show Log
Document
Done
General - Prep: SEAH Policy
Done
General - Prep: Pop Up Blocker
Done
General - Prep: Daily Update and Image
Done
General - Prep: Starlink Mini and Power Supply
Done
General - Prep: Where your work fits
Done
General - Prep: QC Training Video
Done
General - Prep: Genuine Images Only
Done
General - Prep: Changes to school contacts
Done
General - Prep: Additional requirements listed on the Exhibit
Done
General - Site: Summary and Site Awareness
Done
General - Site: Relevant Standard
Done
General - Site: Risk Assessments and Safety Measures
Done
General - Site: Inform Inspector expected date you will leave site
Done
Reticulation: Earthing guidelines if penetration issues
Done
Reticulation: All parts
Done
Reticulation: Pillar box installation
Done
Reticulation: Underground cabling
Done
School BLD: School Hall
Done
School BLD: Designated computer areas
Done
School BLD: Glass bunker lights
Done
School BLD: #1 Ablutions block
Done
School BLD: #2 Ablutions block
Done
School BLD: B1 Reticulation to the BLD
Done
School BLD: B1 Subboard
Done
School BLD: B1 External works report
Done
School BLD: B1 Classrooms/Library etc.
Done
School BLD: B1 Storerooms
Done
School BLD: B10 Reticulation to the BLD
Done
School BLD: B10 Subboard
Done
School BLD: B10 External works report
Done
School BLD: B10 Classrooms/Library etc.
Done
School BLD: B11 Reticulation to the BLD
Done
School BLD: B11 Subboard
Done
School BLD: B11 External works report
Done
School BLD: B11 Classrooms/Library etc.
Done
School BLD: B2 Reticulation to the BLD
Done
School BLD: B2 Subboard
Done
School BLD: B2 External works report
Done
School BLD: B2 Classrooms/Library etc.
Done
School BLD: B3 Reticulation to the BLD
Done
School BLD: B3 Subboard
Done
School BLD: B3 External works report
Done
School BLD: B3 Classrooms/Library etc.
Done
School BLD: B4 Reticulation to the BLD
Done
School BLD: B4 Subboard
Done
School BLD: B4 External works report
Done
School BLD: B4 Classrooms/Library etc.
Done
School BLD: B4 Office and Staff Rooms
Done
School BLD: B5 Reticulation to the BLD
Done
School BLD: B5 Subboard
Done
School BLD: B5 External works report
Done
School BLD: B5 Classrooms/Library etc.
Done
School BLD: B5 Office and Staff Rooms
Done
School BLD: B6 Reticulation to the BLD
Done
School BLD: B6 Subboard
Done
School BLD: B6 External works report
Done
School BLD: B6 Classrooms/Library etc.
Done
School BLD: B7 Reticulation to the BLD
Done
School BLD: B7 Subboard
Done
School BLD: B7 External works report
Done
School BLD: B7 Classrooms/Library etc.
Done
School BLD: B7 Office and Staff Rooms
Done
School BLD: B8 Reticulation to the BLD
Done
School BLD: B8 Subboard
Done
School BLD: B8 External works report
Done
School BLD: B8 Office and Staff Rooms
Done
School BLD: B9 Reticulation to the BLD
Done
School BLD: B9 Subboard
Done
School BLD: B9 External works report
Done
School BLD: B9 Classrooms/Library etc.
Done
School BLD: B9 Office and Staff Rooms
Done
School BLD: Dining room
Done
School BLD: Hostels
Done
Quarters: Q1 Reticulation to Quarters
Done
Quarters: Q1 Subboard, GPOs and Lighting
Done
Quarters: Q1 External works report
Done
Quarters: Q10 Reticulation to Quarters
Done
Quarters: Q10 Subboard, GPOs and Lighting
Done
Quarters: Q10 External works report
Done
Quarters: Q11 Reticulation to Quarters
Done
Quarters: Q11 Subboard, GPOs and Lighting
Done
Quarters: Q11 External works report
Done
Quarters: Q12 Reticulation to Quarters
Done
Quarters: Q12 Subboard, GPOs and Lighting
Done
Quarters: Q12 External works report
Done
Quarters: Q2 Reticulation to Quarters
Done
Quarters: Q2 Subboard, GPOs and Lighting
Done
Quarters: Q2 External works report
Done
Quarters: Q3 Reticulation to Quarters
Done
Quarters: Q3 Subboard, GPOs and Lighting
Done
Quarters: Q3 External works report
Done
Quarters: Q4 Reticulation to Quarters
Done
Quarters: Q4 Subboard, GPOs and Lighting
Done
Quarters: Q4 External works report
Done
Quarters: Q5 Reticulation to Quarters
Done
Quarters: Q5 Subboard, GPOs and Lighting
Done
Quarters: Q5 External works report
Done
Quarters: Q6 Reticulation to Quarters
Done
Quarters: Q6 Subboard, GPOs and Lighting
Done
Quarters: Q6 External works report
Done
Quarters: Q7 Reticulation to Quarters
Done
Quarters: Q7 Subboard, GPOs and Lighting
Done
Quarters: Q7 External works report
Done
Quarters: Q8 Reticulation to Quarters
Done
Quarters: Q8 Subboard, GPOs and Lighting
Done
Quarters: Q8 External works report
Done
Quarters: Q9 Reticulation to Quarters
Done
Quarters: Q9 Subboard, GPOs and Lighting
Done
Quarters: Q9 External works report
Done
Waste Removal: Existing small solar systems
Done
Waste Removal: Waste removal and audit
Done
Wrap: Verification and Testing
Done
Wrap: General close out comments
Done
Wrap: School/Community Support STD
Done
Wrap: Future Works
Done
Wrap: Logistics
Done
Reticulation: Aerial wiring
N/A Done
School BLD: Kindy Standalone
N/A Done
School BLD: Roof repairs
N/A Done
School BLD: B1 Office and Staff Rooms
N/A Done
School BLD: B10 Office and Staff Rooms
N/A Done
School BLD: B10 Storerooms
N/A Done
School BLD: B11 Office and Staff Rooms
N/A Done
School BLD: B11 Storerooms
N/A Done
School BLD: B2 Office and Staff Rooms
N/A Done
School BLD: B2 Storerooms
N/A Done
School BLD: B3 Office and Staff Rooms
N/A Done
School BLD: B3 Storerooms
N/A Done
School BLD: B4 Storerooms
N/A Done
School BLD: B5 Storerooms
N/A Done
School BLD: B6 Office and Staff Rooms
N/A Done
School BLD: B6 Storerooms
N/A Done
School BLD: B7 Storerooms
N/A Done
School BLD: B8 Classrooms/Library etc.
N/A Done
School BLD: B8 Storerooms
N/A Done
School BLD: B9 Storerooms
N/A Done
Quarters: Q1 Roof repairs
N/A Done
Quarters: Q10 Roof repairs
N/A Done
Quarters: Q11 Roof repairs
N/A Done
Quarters: Q12 Roof repairs
N/A Done
Quarters: Q2 Roof repairs
N/A Done
Quarters: Q3 Roof repairs
N/A Done
Quarters: Q4 Roof repairs
N/A Done
Quarters: Q5 Roof repairs
N/A Done
Quarters: Q6 Roof repairs
N/A Done
Quarters: Q7 Roof repairs
N/A Done
Quarters: Q8 Roof repairs
N/A Done
Quarters: Q9 Roof repairs
N/A Done
Wrap: Promotional signage
N/A Done
Core Energy Solutions
Site QC Joeli Ragata joelircama88@gmail.com 1234567 Edit Delete
Its Time Foundation
Inspector Clayton Eigenmann clayton.eigenmann@itstime.org.au 900 1757 Edit Delete
Show Log
Images and videos
Term Report & Payments
Processing...