Please note, this unique platform is active but very much in a live development phase. The data fields are far from up to date - we are targeting end Q3 2026 to have all records current (we go back to 2010, it's a big job :-) There will be occasional bugs along the way - should you notice any issues, your feedback is welcomed via iitime.org/contact-us.

Wainikeli Secondary School (1234-P1234)

About

Docs & Links

Specifications

Works & Maintenance

CO2 & $s

Contacts

Charge data

Term Reports

Solar Settings
Its Time IN PROGRESS
2026 Wainikeli 2
School Role & Facilities
Last Updated:
Students:
Teachers:
Classrooms:
Kindergarten:
Offices:
Storerooms:
Library/computer area:
Teachers homes in the school grounds:
Boarders (live-in students):
Hostels (Boarding houses):
Dining rooms:
Ablutions Blocks:


Carbon Dioxide and Financial Savings
Document

Wainikeli Secondary School

Annual school fuel saving (litres) (1)

Annual fuel saving 0 teachers' homes getting solar (litres) (2)

Annual cartage saving (litres) (3)

Total annual fuel saving (litres) (4)

Fuel saving over 30 years (litres)

Annual CO2 saving (kgs)

CO2 saving over 30 years (kgs)

Annual AUD saving (8)

Annual USD saving

Annual FJD saving

30 yrs AUD saving

30 yrs USD saving

30 yrs FJD saving

Total of All It's Time Solar Schools

Total annual school fuel saving (litres)

22,580

Total annual fuel saving 99 teachers' homes getting solar (litres)

4,550

Total annual cartage saving (litres)

3,387

Total annual fuel saving (litres) (4)

30,569

Total fuel saving over 30 years (litres)

917,070

Total annual CO2 saving (kgs)

77,943

Total CO2 saving over 30 years (kgs)

2,338,523

Total annual AUD saving (8)

$ 111,057

Total annual USD saving

$ 60,330

Total annual FJD saving

$ 129,282

Total 30 yrs AUD saving

$ 2,585,640

Total 30 yrs USD saving

$ 1,760,940

Total 30 yrs FJD saving

$ 3,878,460

Assumptions

Fuel cost in the islands in AUD/litre (5)

3.00

Fuel cartage consideration % (3)

0.15

Annual fuel consumption per teacher's home wired (litres) (2)

50.00

Annual generator maintenance consideration AUD (6)

1500.00

CO2 produced per litre of fuel burned (kgs) (7)

2.55

AUD to USD conversion rate used

0.70

AUD to FJD conversion rate used

1.50

Notes

(1) This is the annual fuel consumption based on reporting from the school at the time of school survey and affirmed at the time of installation. It refers to direct fuel use by the school, not including teachers' homes.

(2) The fuel consumption of teachers' homes varies considerable between homes and over time. Their sources of energy varies from their own small generators to shared generators, still some use kerosene for lighting and some small solar (often failing) for lights and charging. Recently on Beqa Island two of the 7 households at one school were each using 10 litres of fuel per week and some were using very little. So, we have chosen the conservative underestimate of each household saving of 2 litres per week (approx. 5 kgs of CO2).

(3) Most schools have a cost to get fuel to the school - usually small boats and car/truck on the mainland. The costs vary from small amounts to some schools where the cartage cost is almost the same as the cost of the fuel itself. The cartage consideration (dollar and carbon cost) is a percentage of the total fuel consumption, because it varies widely from school to school we have chosen quite a conservative estimate.

(4) Includes cartage and teachers' home consumption estimate that therefore contribute to the total CO2 saving. But we do not include the teachers home in the financial saving - rather we just refer to the savings from the school generator.

(5) This is the current published diesel price in Fiji presented in AUD. Often the islands pay a higher price, but that is not factored in, so generally the price will be a small under estimation.

(6) Generators often require repairs and eventually replacement. That cost varies significantly from school to school, so a conservative value is applied to represent this component of cost/saving for all schools. It is not possible to calculate that accurately for every school, hence the estimate across all.

(7) Burning diesel produces CO2 at a rate of 2.68 kgs/litre, whereas petrol produces it at a rate of 2.31 kgs/litre. We have chosen 2.55 as the approximate for our calculations because there is more diesel used than petrol in the school generators.

(8) The fuel savings in the teachers' homes are not included in the calculation of financial savings for the school. Although teachers are asked to make a small contribution each term (FJD70) for their now 24-hour power and this goes to the school to buy more education resources.

Specifications
Document


Inverters

Inverter type

Panels

Panel type

Number of panels

Array (watts)

Mountings

Mountings

Brand

Batteries

Battery type

Number of batteries

Kilowatt hours

Batteries mounted


Partners

Solar contractor

General electric works constractor

Contacts
Document
Status First Name Last Name Position Questionnaire Role Phone Email FB Note Edited
Active Eneriko Qalica HOS Read Only 2388754 enerikoqalica021@gmail.com Sep 26

Enter any potentially relevant or useful contacts aside from the school. For example, carpenter, home stays, transport, resort managers, marine biologists etc. Or details such as a Ministry or other notable person who attended the school. Whoever may have relevance or use in the future.

Charge data
Don't have login?
Document

This data is currently only available to the school and admin.

  Event

Works & Maintenance
Document
No staff records found.
No staff records found.
Show Log
Document
To do
General - Prep: Pop Up Blocker
To do
General - Prep: Starlink Mini and Power Supply
To do
General - Prep: Daily Update and Image
To do
General - Prep: SEAH Policy
To do
General - Prep: Where your work fits
To do
General - Prep: QC Training Video
To do
General - Prep: Genuine Images Only
To do
General - Prep: Additional requirements listed on the Exhibit
To do
General - Site: All staff must read.
To do
General - Site: Relevant Standard
To do
General - Site: Summary and Site Awareness
To do
General - Site: Risk Assessments and Safety Measures
To do
To do
General - Site: Inform Inspector expected date you will leave site
To do
Reticulation: All parts
To do
Reticulation: Earthing guidelines if penetration issues
To do
Reticulation: Underground cabling
To do
School BLD: Designated computer areas
To do
School BLD: Ablutions block
To do
School BLD: Reticulation to the BLD
To do
School BLD: Subboard
To do
School BLD: Classrooms/Library etc.
To do
School BLD: External works report
To do
School BLD: Office and Staff Rooms
To do
School BLD: Storerooms
To do
Waste Removal: Existing small solar systems
To do
Waste Removal: Waste removal and audit
To do
Wrap: Verification and Testing
To do
Wrap: General close out comments
To do
Wrap: Logistics
To do
Wrap: School/Community Support STD
To do
Wrap: Future Works
To do
Wrap: Promotional signage
To do
Vision
Site QC Anish Narayan tech9@courts.com.fj 220 0093 Edit Delete
SEIAPI
Inspector Sandip Kumar sandip.kumar@itstime.org.au +679 836 5285 Edit Delete
Show Log
Document
General - Prep: Feedback on solar QC
To do
General - Prep: Documentation
To do
General - Prep: Additional requirements listed on the Exhibit
To do
To do
General - Site: Passwords
To do
General - Site: Summary and Site Awareness
To do
Reticulation: All parts
To do
To do
Battery System: Documentation
To do
Battery System: Earthing
To do
Battery System: Signage
To do
Commissioning: Documentation
To do
Wrap: Required Labelling and Signage
To do
Wrap: General close out comments
To do
Wrap: Future Works
To do
Wrap: Promotional signage
To do
Wrap: Finished Images
To do
Equip. Specs: Noark Manuals
N/A
General - Site: Roof repairs
N/A
Mounts - Ground: Post depth, spacing and overhang
N/A
Inverter - PV: Installation
N/A
Inverter - Battery and Hybrid: SMA Tech Support Email
N/A
Battery System: EnergyTrak Gateway
N/A
Waste Removal: Small Solar Systems
N/A
Waste Removal: Waste removal and audit
N/A
General - Prep: FCCC
QC ready
QC ready
General - Prep: Daily Update and Image
QC ready
General - Prep: SEAH Policy
QC ready
General - Prep: Starlink Mini and Power Supply
QC ready
General - Prep: Pop Up Blocker
QC ready
General - Prep: QC Training Video
QC ready
General - Prep: Where your work fits
QC ready
General - Prep: Genuine Images Only
QC ready
General - Prep: Changes to school contacts
QC ready
QC ready
QC ready
QC ready
QC ready
QC ready
QC ready
QC ready
Equip. Specs: REC 460 Spec Sheet
QC ready
Equip. Specs: REC 460 User Manuel
QC ready
Equip. Specs: Trina User Manual
QC ready
Equip. Specs: Noark/Deye Support. Call if needed
QC ready
QC ready
General - Site: Inverter and Battery Name Plates
QC ready
General - Site: Risk Assessments and Safety Measures
QC ready
General - Site: Risk Assessments and Safety Measures
QC ready
General - Site: Inform Inspector expected date you will leave site
QC ready
Mounts - Roof: Array mounting
QC ready
Array DC wiring: Clayton input to stringing
QC ready
Array DC wiring: Cable ratings
QC ready
Array DC wiring: Cable Ties
QC ready
Array DC wiring: String Configuation
QC ready
Array DC wiring: Earthing
QC ready
Array DC wiring: Enclosures
QC ready
Array DC wiring: Junction box
QC ready
Array DC wiring: Physical Protections
QC ready
Array DC wiring: Standards and requirements
QC ready
Array DC wiring: String protection
QC ready
Inverter Hybrid: Refer Inverter - Battery and Inverter - PV
QC ready
Inverter Hybrid: Dongle Info
QC ready
Inverter - PV: AC protection
QC ready
Inverter - PV: AC wiring
QC ready
Inverter - PV and Hybrid: Inverter isolator
QC ready
Inverter Hybrid: Noark Commissioning
QC ready
Inverter - Battery and Hybrid: AC protection
QC ready
Inverter - Battery and Hybrid: AC wiring
QC ready
Inverter - Battery and Hybrid: Equipment Standards
QC ready
Mainboard: Mainboard
QC ready
Battery System: Cable selection
QC ready
Battery System: Cable lengths must match in multi stacks
QC ready
Battery System: General
QC ready
Battery System: Non-combustible barrier
QC ready
Battery System: DC Breakers
QC ready
Commissioning: AS/NZS 3000
QC ready
Commissioning: Verification and Testing
QC ready
Wrap: Lights are on video
QC ready
Wrap: Images for sponsors
QC ready
Wrap: School/Community Support STD
QC ready
Wrap: Logistics
QC ready
Vision
Site QC Ana Tauleka graduate1@visionenergy.com.fj phone to follow Edit Delete
SEIAPI
Inspector Sandip Kumar sandip.kumar@itstime.org.au +679 836 5285 Edit Delete
Show Log
Images and videos
Term Report & Payments